Cellar expansion at Forst Brewery 2023
- Division Process Technology
- Posted on 10.05.2023
- All news and dates
Cellar Expansion at Forst Brewery 2023
Our latest Cellar expansion at Forst Brewery in Algund, South Tyrol, Italy:
25 new Fermenters @ 1700hl and 31 new Storagetanks @ 720hl replaced an existing building with horizontal tanks.
Design focus:
- Reduced water, CIP liquid consumption by advanced and efficient arrangement of the process piping and intelligent automation system.
- Minimized product losses by Handtmann SOL – pinging system
- High level CO2 recovery during fermentation process by individual automatic controlled components
- Automatic Sampling system controlled by tablets
- Reduced demand of glycol by ring pipe configuration
We are very proud to continue our support for the brewery since the end of the 80’s.
Many thanks to the Forst-Team for the cooperation during the project realization.